One-For-Two Smart Mask Machining Custom Contract
One-For-Two Smart Mask Machining Custom Contract
Mar 23, 2020
According to the "Contract Law of the People's Republic of China," the buyer and the seller have signed an agreement on this purchase and sale through equal negotiation through the purchase by the buyer to the seller and the seller selling the equipment under this contract:

1.Equipment name, quantity, specification, model: Attachment "price list".

Name: One for two mask machine project + packaging machine.

Name

Brand

Quantity

unit

Unit price

Total price

Remark

Full servo intelligent one support two mask machine

HAITEL

1

station

580000

580000

Servo intelligent control

Automatic Servo Smart Mask Packaging Machine

HAITEL

1

station

100000

100000

Total price

(RMB¥68w)EXW

2.Payment method:

In advance,  in one working day after the contract is confirmed, capitalized in;
After the equipment is completed, Seller will ship the goods after paying the balance of  within 1 working day.
Go to factory training before delivery;

3.Technical indicators and scope of supply: For relevant technical indicators and scope of supply, please refer to the "Details of Project Quotation" and technical agreements. As an annex to the contract, it is an integral part of the contract

4.Equipment delivery:
Delivery place: Seller
Address:
5.Delivery period: 30 days after receiving the full payment of the contract and sent to Pingxiang; Equipment delivery refers to the buyer's acceptance of the specifications, models, quantities, appearance and packaging of the equipment delivered and used by the seller. Delivery shall be performed by the buyer and seller or by the buyer and the carrier. The buyer assumes the obligation and risk of damage to the equipment after delivery. If the specifications and models are found to be incorrect during the delivery of the equipment, the quantity is short, the appearance is fouled, and the packaging is damaged, the two parties of the delivery shall sign the records and the seller shall remediate or negotiate to deal with them. If the buyer has any objection to the receiving equipment, he must submit a written letter to the seller within one working day from the day after the receipt of the goods.

6.Packing method, transportation and freight:
1.The equipment under this contract shall be packed by the seller according to the following methods: wooden box or simple packing, packing costs shall be borne by the seller;
2.The seller's packaging of the equipment shall be sufficient to withstand the mode of transport agreed upon in this contract and protect the equipment from damage;
3.Transportation method and cost: For transportation by motor vehicle, the buyer shall pay the transportation cost;
4.The equipment shall be borne by the buyer after the equipment arrives at the buyer's factory。
7.Equipment installation and commissioning, training and acceptance:
1.Staff training scope, methods, training fees and payment methods:
2.Training scope: operating methods, maintenance, and troubleshooting methods;
3.Training method: live explanation and demonstration;

Training content: training of buyers' operators and maintenance workers in operation, maintenance, judgment and troubleshooting of common faults.

Main power supply voltage (change range should be less than + 7% of AC220V).

The gas source pressure and flow are unstable, the pressure is lower than 0.5Mpa, the gas source moisture is large, and fails to meet the basic requirements of the equipment.
8.If the equipment fails during use, the seller's engineer provides technical support to the buyer through video, telephone, and email.

9.Liability for breach of contract:
Under the conditions of the buyer's compliance, if the seller delays delivery, the seller shall pay to the buyer a late penalty of 0.1% of the total price of the goods each week, and the number of late days less than one week shall be considered as one-week settlement, but the maximum shall not exceed the delay Five percent (5%) of the total price of the goods; if the buyer delays the payment, the buyer shall pay the seller a penalty fee of 0.1% of the unpaid amount of the contracted goods every week. Weekly liquidation, but no more than five percent (5%) of the total price of the delayed delivery;

After the equipment is commissioned, the efficiency is at least 90 pieces per minute. If the efficiency is not reached, the buyer has the right to choose a return and the seller refunds the full payment.
10.Force Majeure:
1.Incidents of force majeure as stipulated in this contract that are unforeseen by either party at the time of signing this contract and cannot be avoided or affected by the affected party, and have an impact on the performance of this contract;

2.If a force majeure event occurs, the contractual obligations of both parties A and B affected by the event will be suspended during the delay period caused by force majeure;

3.When either party A or B suffers force majeure, it shall promptly notify the other party, explaining that it needs to provide reasons for the occurrence of force majeure, and shall provide appropriate proof of the occurrence and duration of the force majeure event within 15 days thereafter;

4.In the event of force majeure, the two parties shall reach an agreement on the performance of this contract or the termination of this contract.
11.Dispute Resolution:
The parties shall abide by the terms stipulated in this contract. If a dispute arises in the course of performance, it shall be settled in accordance with the principle of friendly negotiation. If a dispute arises in the understanding of the relevant terms of the contract, the true meaning of the terms shall be determined according to the purpose of the contract, transaction habits and principles of good faith;

2.All disputes concerning the execution of the contract shall be settled through friendly negotiation between the two parties. If the two parties cannot resolve the dispute, the ruling shall be made in accordance with the relevant regulations of the Contract Law of the People's Republic of China, and the people's court where the contracting party is located shall exercise jurisdiction.

12.Contract changes and assignments:
1.Once this contract takes effect, neither party may change it at will, except for the written agreement reached between the two parties.

2.The Buyer shall not transfer this contract without the consent of The Seller.

13.Contract effective and period:
1.This contract must be sealed or signed by both parties, and it will take effect from the date of the last party's seal or signature; (fax and WeChat are valid)

2.This contract terminates on the date when the matters agreed in this contract are processed.

14.Notice clause:
The "written notice" in this contract and the changes between the parties A and B and any other related matters can be delivered by the recipient by direct delivery, registered mail, express mail, fax, E-mail, WeChat to the other side.

Technology Agreement

Attachment1:
Equipment introduction

1.Equipment Overview:
This machine is mainly used for the automatic forming of flat masks: the whole roll of fabric is driven by rollers after unwinding, and the fabric is automatically folded and hemmed; the entire length of the nose bridge is pulled and unrolled, cut to length and introduced into the hemmed fabric. Ultrasonic welding to the sealing, then ultrasonic side sealing, cutting with a cutter; conveying the mask to the two mask earband welding stations through the assembly line, and finally forming the mask through ultrasonic welding; when the mask is made, it passes the assembly line Conveyed to flat belt line for collection.

2.Equipment diagram (This picture is for reference only, the equipment is subject to the actual product)
One for two plane mask machine

Item

Number

Width(mm)

Coil outer diameter(mm)

Inner diameter of barrel(mm)

weight

Cloth

3

170~200

Φ600

Φ76.2

Max 15kg

Bridge of nose

1

3-7

Φ400

Φ76.2

Max 25kg

Earband

4bags

3

——

——

——

Production Specifications
Standard type: disposable medical mask 175 * 95m
The main structure of the equipment
The main component structure of the device

NO

Part Name

Quantity

Remark

1

Water filter cloth / filter cotton / water absorption layer unwinding mechanism

3

Max4 sets random with 3 sets

2

Nose bridge strip unwinding mechanism

1


3

Nose bridge straightening mechanism

1

width 3-7mm

4

Nose bridge strip driving and cutting mechanism

1

width 3-7mm

5

Cloth hemming mechanism

1


6

Roll welding edge sealing mechanism

1

bilateral

7

Cloth driving mechanism

2


8

Cloth fan folding mechanism

2


9

Roll welding side seam mechanism

1


10

Roll-sealing mechanism

1


11

Transfer line

3


12

Shunt

2


13

Ear band welding machine mechanism

2


14

Cutting line

2


15

operating system

1


16

Operation panel

1set


Equipment detailed introduction
Introduction of equipment overview diagram
Equipment appearance size chart
Detailed introduction of each station of the equipment:
  • Raw material discharge unit
  • Diversion conveyor line unit
  • Earband spot welding unit
Equipment production process description

Raw materials—molding—nasal bridge fill—over—edge compression—mask body welding—slicing—conveying shunt—ear band welding—collection—packaging—sterilization—EO—finished products
In order to realize the above manufacturing process, our company is equipped with fully automatic production equipment. The full-automatic equipment is one-piece molding. One mask slicer and two ear-spot spot welders can be automated from raw material feeding to packaging completion.

Full automatic mask production line with one machine and one machines Efficiency: 45-55pcs / min

Full automatic mask production line with one machine and two machines Efficiency: 90-110pcs / min

Equipment technical parameters
Equipment production capacity
(1)Production efficiency: 80-110ppm;
(2)Qualification rate of equipment production: 98% -99% (except when the incoming materials do not meet the requirements or the employees' improper operation is excluded)
(3)Equipment failure rate: 3% (refers to the failure of the equipment itself)

Equipment installation and environmental requirements
(1)Equipment size: 6500mm (L) × 4500mm (W) × 1900mm (H);
(2)Appearance color: international standard warm gray 1C (win-win standard color), according to this standard without special instructions;
(3)Equipment weight: ≤5000kg, ground load ≤500KG / m2;
(4)Working power: equipment 220VAC ± 5 ﹪, 50HZ, rated power about 9KW;
(5)Compressed air: 0.5 ~ 0.7 MPa, using flow rate of about 300L / min;
(6)Operating environment: temperature 10 ~ 35 ℃, humidity 5-35% HR, no flammable and corrosive gas, no dust (cleanness no less than 100,000).
Common equipment configuration requirements
Configuration list of main components

No.

Item

Brand

Remark

1

cylinder

CKD, SMC / Japan, Yadeke, Qi Li Ke / Taiwan


2

The electromagnetic valve

CKD, SMC / Japan, Yadeke


3

Servo motor

Mitsubishi / Japan, Matsushita / Japan, Niding / Taiwan


4

PLC

Xinjie / China, Mitsubishi, Omron / Japan


5

Ordinary speed motor

Xinshengda / China


6

Bearing

NSK / Japan, HRB / China


7

Line rail

STAF、PMI、CPC、HIWIN/Taiwan


8

optical fiber amplifier

Omron, Boyi Precision, Panasonic / Japan


9

touch screen

Xinjie / Kunlun State


10

Relay

Omron/ DELIXI


11

Button

DELIXI


12

ultrasonic wave

CONPROFE



Attachment2:

NO.

name

name

Quantity

Note

1

One support two mask machine

HTL120

1

1-1Raw material discharge unit
1-2Forming section unit
1-3Material distribution conveying unit
1-4Earband spot welding unit # 1
1-5Earband Spot Welding Unit # 2

2

Product certification


1


3

Instruction Manual


1


4

Servo Motor Instruction Manual


1


5

Inverter manual


1


6

Company brochure


1


7

Product Outbound Order


1


8

Random Accessories

8.1

Allen wrench




8.2

Open end wrench

8-10

1


8.3

Open end wrench

14-17

1


8.4

Open end wrench

13-17

1


8.5

Grease gun


1


8.6

Nose bridge


1


8.7

scissors


1


8.8

Toolbox


1


Characteristics:
1.With three servo motors, the bag can be set and cut immediately. It is necessary to adjust the air bag and move in place, saving time and film.
2.In the machine world, parameter setting is quick and easy.
3.Fault diagnosis function, clear fault display.
4.Sensitivity photoelectric eye target tracking, digitizing the sealing and cutting position of input and output, making the sealing and cutting position more accurate.
5.Temperature independent PID control, better suitable for various packaging materials.
6.Positioning stop function, no sticking, no waste of film.
7.The transmission system is simple, the operation is more reliable, and the maintenance is more convenient.
8.All controls are realized by software, which facilitates function adjustment and technology upgrade, and keeps advanced.

Application:
Suitable for masks, cakes, cakes, snow cakes, custard pie, chocolate cakes, candy, bags, snacks, cakes, medicines, consumer goods, industrial parts, cartons
Or pallets and other types of regular objects.

Main technical parameters:

Packaging film width

Max.350mm

Bag making degree

170-320mm

Bag width

50-170mm

Product height

Max.40mm

Film roll diameter

Max.350mm

Packing speed

50-120 包/分bag/min

Voltage specifications

220V/380V 50HZ

Power Specifications

3kw

Machine size

(L)4200×(W)1250×(H)1750mm

total weight

600Kg

Note

Can be equipped with charging and coding devices

Main collocate:
  • PLC and touch screen: Taiwan
  • Photoelectricity switch: Yatai
  • Transducer: Yatai
  • Push button: Delixi
  • Temperature controller: Delixi
  • Approach switch: Delixi
  • Servomotor: Taiwan
  • Motor: Zhongweite
Product Catalog